Ty Mawr Lime, Brecon
Statutory Designation - Grade II*
The project included the construction of a single storey link block between a pair of existing Granary buildings to accommodate a kitchen and toilet facilities. The facilities are generally used in conjunction with the traditional building skills and ecological materials workshops hosted for professionals and the general public at Ty Mawr Ltd throughout the year. A new conference room was created at first floor together with a ground floor teaching/display space during the course of the works. A new green oak staircase provides access externally to the learning facilities, while a covered porch space links the new accomodation with the existing building.
The works were and continue to be a practical teaching resource.
Consultants - M&E Greenearth Energy
Main Contractor - R. J. Davies Ltd